
Launch Pad Operations & Mission Support
With over 20 missions completed as a LAUNCH PAD ELECTRICIAN, we have supported launch campaigns, providing electrical support for ground systems, integrated systems testing, wet dress rehearsals, and full launch operations.
Enquire
Launch Operations (Pre-Launch & Active Operations)
Launch Operations (Pre-Launch & Active Operations)
OVER 20 MISSIONS
More than 3 years of experience supporting launch campaigns across New Zealand and the United States as a launch pad tech electrician.
Launch Operations
(Pre-Launch & Active Operations)
Pre-launch Integrated Systems Testing
-
System integration checks
-
Power system validation
-
Fault detection and troubleshooting
-
Launch readiness confirmation
Wet dress rehearsal support
-
Full countdown rehearsal execution
-
Electrical system validation under load
-
Live monitoring of power and control systems
-
Issue identification prior to launch readiness
Launch sequences and critical operations support
-
Countdown sequence support
-
Live system monitoring
-
Power and control system oversight
-
Operational response and issue resolution
Launch cycle instrumentation and control support
-
Instrumentation system monitoring
-
Control system verification
-
Signal integrity checks
-
Launch cycle data oversight
Launch Pad Electrical Technician (Maintenance)
Pad Electrical Systems Maintenance
-
Routine inspection of launch pad electrical systems
-
Preventive maintenance and fault prevention
-
Electrical repairs and component replacement
-
Compliance with safety and operational standards
Critical Power & Redundancy Systems
-
Maintenance of primary power distribution systems
-
Generator inspection, testing, and servicing
-
UPS system maintenance and reliability checks
-
Power redundancy and failover validation
Ground Support & Control Interfaces
-
Maintenance of electrical ground support equipment
-
Support for control panels and operator interfaces
-
Electrical integration with mechanical and fluid systems
-
Troubleshooting interface and system communication issues